Ekonomia

KESH opens the gates of Fierza Hydropower Plant

KESH opens the gates of Fierza Hydropower Plant

KESH has opened the gates of the Fierza hydropower plant since noon today. According to the Albanian Electricity Corporation, the water level in the Fierza hydropower plant has reached the maximum quota of 288 meters. H

The opening of the HEC gates has come as a result of the rains which have returned to the territory of the country after several sunny days, but accompanied by cold temperatures.